MARUFRAIHAN.WORKS
Shanta Forum
Client
Ehsan Khan Architects
Shot in
2021
The First Twin Towers of The Country
Sophisticated Double Height Reception Atrium
08 Smart Destination Elevators (Ensuring Optimized Energy Efficiency and Minimum Wait Time), plus 02 Service Elevators
12’ Clear Floor to Ceiling Height at Typical Floors
Efficiently Designed Floor Space Providing Maximum Flexibility for Interior Design
Professional Landscaping and Lighting Design
200’ Wide Landscaped Open Plaza on Ground Floor Creating an Unparalleled Entry Experience
Insulated Double-glazed, 32 mm, Low-E, Heat Resistant Glass in A Fully Unitized Curtain Wall System for Energy Efficiency, Durability, Dust and Waterproofing
State-of-the-Art Firefighting and Smoke Detection System
Electro-Mechanical Engineering (EME) Design by EEC Lincolne Scott Co.
Façade Design by Meinhardt Group
Artsy Cafe On Premises
Landscaped Rooftop
iBMS (Integrated Building Management System) for Complete Monitoring of HVAC, Power, Lighting, Fire Detection and Security
350 Car Parking in Three Basement Levels with Sensor-Based Mechanical Ventilation System
Fire Stairs with 2-hour UL Certified Fire-resistant Doors
Central HVAC System with Water Cooled Centrifugal Chillers and Load Management
Full Load Power Backup with the Most Advanced Generator
Common Area Finishing with Exclusive Imported Materials & Fittings
Central Fire Command & Control Room with 24/7 Professional Monitoring Team
Management Office and Drivers' Waiting Rooms with Washrooms
Central CCTV Monitoring & PA Systems
10 Years Building Facilities Management Services by Shanta Holdings